Is Your Property Ready for a Charging Station Franchise?

Your property is ready for a charging station franchise when drivers can reach and use the bays during advertised hours, enough visitors have a reason to charge, and the site can support the electrical load. Start with a walkthrough and a review of parking activity. Then have a qualified electrical professional and the local electricity distribution company, or DISCOM, confirm the supply options. The aim is to arrive at the first operator discussion with a site plan and useful evidence about how the property works.
A Charging Station Franchise Checklist for Property Owners
Print a parking plan or mark a copy of an aerial photo. Sketch the entry, exit, proposed bays, pedestrian route and electrical room. Walk that route at busy and quiet times. Note where cars queue, where service vehicles unload and which gates close after hours. Have someone who has never visited the property find the proposed bay using a map pin. Their route may reveal a guard checkpoint or an awkward turn that regular staff no longer notice.
Entry, parking and customer access
Road access: Drivers should be able to identify the entrance from the intended approach and reach it through the normal access route.
Gate access: Security staff should know who can enter, during which hours, and whether a parking ticket or vehicle registration is required.
Bay layout: Cars should be able to park and leave without blocking traffic. Different vehicle types should also be able to reach the charging cable from the proposed bays.
Pedestrian route: Each charging bay should connect to a usable walking route without directing customers through loading areas.
Bay management: Staff should have a clear process for handling situations where a vehicle occupies a charging bay without an active charging session.
Weather exposure: The site survey should record drainage, sunlight, lighting and potential exposure to heavy rain.
Ask site staff which parking rule they can enforce consistently. A charging-only sign is useful when guards know whom to call and customers know where to move after a session. Confirm that the property team can communicate any gate fee or parking charge before drivers arrive.
Dwell time and actual demand
Count arrivals and departures during periods that represent your property. A restaurant may see lunch and evening peaks, while a clinic may have heavy weekday use. If you can, record broad visit lengths and whether EVs are already parking on site. Ask tenants whether they expect to bring EVs regularly and at what hours. Keep observed visits separate from enquiries and future interest.
Consider an illustrative row of shops where drivers stay around 20 minutes, and an office car park next door where employees stay several hours. The shops may need a charger that can deliver useful energy during a short stop, if customers actually want to charge. The office can assess lower-power options against much longer parking windows. Both sites may see the same road traffic. Their charging needs depend on who can park and for how long.
Confirm the Available Electrical Capacity
Give your electrical professional recent bills, available drawings, details of major loads and any planned property upgrades. Ask for an assessment of the existing supply, peak building demand and the charger load if several vehicles plug in together. A recorded peak gives the surveyor a starting point. Ask them to check which major equipment runs together during the periods you expect to need charging.
Ask the DISCOM about supply options for the site and which party should apply. Compare the cable route and civil work from the point of supply to each proposed bay. A car park beside the road may look ideal, but a long cable route or a road crossing within the property can change the cost and how work is scheduled. Have the survey team record these conditions before anyone prices a final design. NITI Aayog’s handbook covers site planning, EV electricity supply and managing charging loads. Handbook for EV Charging Infrastructure Implementation
Allow for changes in the property
Note upcoming tenant fit-outs, cooling upgrades or new lifts that could use part of the spare capacity. Ask the engineer whether shared charging power or a phased installation could fit the property better. Compare what happens when several EVs plug in at once and make sure the proposed performance still fits visitor dwell time.
Compare two positions on the same property
Mark an alternative bay beside the original whenever space allows. In an illustrative supermarket, the front bays offer better visibility but fill up on weekends. A side bay has a shorter cable route and more room for cars to turn, but drivers need clear signs. Photograph both approaches, describe what staff can manage and ask the surveyor to price the two layouts. This gives the owner a backup if the first proposal conflicts with a tenant’s parking rights or needs work in a busy driveway.
Prepare a Site Pack for EV Charging Companies
Include the location pin, operating hours, photos, bay plan, expected user groups, observed parking patterns and survey findings. Explain which bays you can reserve and who has authority to approve work. Where details remain open, say who will check them and when you expect an answer. Providing the same site information helps EV charging companies prepare accurate proposals and makes it easier to compare their offerings.
Send the same site pack to each shortlisted operator, including EarthtronEV if you are comparing its proposal with others.
Frequently Asked Questions
Can a tenant offer parking for a charger?
Check the lease and parking rights, then obtain written consent from the person authorised to approve the installation. Clarify who can grant access to common areas for service and who pays for reinstatement if the tenant leaves.
Can staff and the public use the same bays?
They can if your access and parking plan accounts for both groups. Check when staff typically arrive and whether this overlaps with customer demand. Test the gate instructions with both a staff vehicle and a public visitor.
Should I use the bays nearest the entrance?
Compare the whole route. The closest bays may be heavily used for other purposes or difficult to cable. Walk the alternative routes and ask the survey team to compare driver convenience with installation work.
What should I record during the monsoon?
Photograph where water gathers and ask security when access becomes difficult. Give that information to the survey and installation team so they can evaluate placement and drainage.
Do I need all the bays marked out before my first operator meeting?
A clear sketch and measurements are enough for an initial discussion. Mark the final bays after the site team approves the plan and has resolved access and power questions.
Decide Whether the Property Is Ready
Review the plan with the property manager, parking supervisor and electrical professional. Write down any issue that could prevent a driver from reaching the bay or the site from delivering the required power. If the issues can be resolved, send the pack for competing proposals. If demand or electrical capacity and Smart Transportation is still uncertain, resolve that question before committing parking space or equipment funds.